Containers and Silos
Stora Enso Uimaharju 2011: container delivery
Joutseno Pulp, tanks for alkali, 2007
Stora Enso, Varkaus, Weppi08, tanks
Stora Enso, Varkaus, PK8, tanks 5 p., 2007
UPM-Kymmene Kaukas, tanks for pressure impregnation solution in saw-mill, 2008 ja 2009
Stora Enso Imatra mill, tank for causticizing 300 m³
Bio 09 Stora Enso, Kaukopää, polymer production unit, different vessels 5 p., mixers 4 p., manufacturing and installation
Larox, piping and tank deliveries, 2010
UPM-Kymmene, Kaukaan saha, screws and tanks, 2010
Laitex Oy: silos, steel frame for the conveyor
Stora Enso Kaukopää 2012: tank for lime sludge 1000 m³
Dieffenbacher Panelboard Oy: delivery of tanks for different projects
Valio Oy: tanks
Mesmec Oy: tanks
Steel structures and steel structure production
Stora Enso Kaukopää ja UPM Kaukas: pipe and pedestrian bridge
Savonlinna Works Oy 2012: Stainless steel/FE-clarifiers and trays
Savonlinna Works Oy: LMF-filter’s pools, clarifier, steam pipeline
Jatke Oy: Rajamarket/Lidl Mustolan steel structures, shelter frame for carriages for the Rajamarket/Lidl Mustola
Steel frames for useful waste hall, hazardous waste hall and machine hall
Coolings towers for caustic and clorate plants
Storage silo bottom and discharge screw modernization Wood chips magnet steel structures
Foundation and frame structures for the 3-extractor
3D- and x-ray measurements building, steel and construction works pipe bridges for UPM-Kymmene Oyj Kaukas and Stromsdal Oyj Juankoski
KA1 steam pipe line dismantling
Steel constructions for Steam boiler plant, UPM-Kymmene Oyj Kaukas
Steel constructions for hydrogen boiler plant, Finnish Chemicals Oy Joutseno
Steel constructions for board mill, M-Real Oy Simpele Board
Steel constructions, pipe and equipment installation Lappeenrannan cement production
Parts for mining industry, Larox Oy
Parts for storage structures and steel structures, Prepipe Oy
Parts and frame structures for trucks and trailers
Parts and platforms for wood processing industry, a numbers of projects
Nordkalk, steel contractions for conveyer, manufacturing and installation, 2010
Paakkola Conveyors ,Talvivaara: platforms and stairs approx. 1500 m
HL-Rakentajat Oy: steel structures for the Prisma Imatra moll approx. 500 tn
Skanska Talonrakennus Oy: steel structures for the IsoKristiina moll
Destia: steel structures, stairs and rails for the Länsimetro project approx. 300 tn
Stora Enso Uimaharju: Reno-projekti: steel structures and machine installation
Metsä Board Simpele: service platform, stairs and steel structures
Stora Enso Kaukopää: Lapa-projekti: steel structures
PE2 replacement of bearings and rolls
Northland Resources Pajala 2012: Ore dressing platforms and stairs approx. 1 km
Screw conveyors and other conveyors
UPM Kaukas 2012: screw conveyers for saw-mill
Laitex Oy 2012: screw conveyer and spares parts
Metal structures subcontracting services
Parts for paper industry, Vaahto Oy
Shipping through OMP-Konepaja Oy to Olkiluoto atomic power station, 2009/2010
Savonlinna Works 2012: sheet metal work on filters, our workshop
Installation projects
Metehe: storage, 150 t steel constructions. Columns, beams, wind braces, frames, 3 months for engineering and installation
Bollstabruk Ab: saw-mill unit installation, 2010
Nordkalk 2011: ore dressing equipment installation steel constructions manufacturing
Ovako Imatra 2011: excitation unit and conveyor manufacturing and installation
Agnico-Eagle Kittilä 2011–2012, pasta plant installation, assemblers and welders up to approx. 20 people, 2 supervisors
Northland Resources Pajala 2012: stainless steel/fe-railing approx. 3 km
GL&V / Metsä Board Simpele: machine’s installation
UPM Kaukas:
replacement of the freezing conveyor’s foundation
crusher installation and steel structures
screw conveyor production and installation
replacement and repair of the lime kiln
Ovako: adjustment of the crane track, replacement of the wear pads for walking beam, replacement and installation of the UTAB kiln
Efora Oy: chemical plant: heat exchangers
Maintenance
Stora-Enso, Kaukopää, lime sludge tanks repair, lining and reinforcement 2010
Nordkalk 2012: feed conveyer reinforcement and modernization
Ecofiltres feed tank modernization
Stora Enso Imatra 2012: approx. 70 assemblers and welders, also management
UPM Kaukas 2012: annual maintenance, approx. 60 assemblers and welders, 5 supervisors
UPM Kaukas 2012: lime sludge feed tank modification
Botnia Mill Service Oy Ab: maintenance of the waste water facility and the debarking plant
Stora Enso Kaukopää 2012: Debarking wide maintenance
UPM Kaukas week 13/2014, annual maintenance of integrated production unit, 70 workers
StoraEnso Kaukopää week 39/2014, 75 workers
Cutter service, Andritz, Botnia Joutseno debarking